Ukrhydroenergo PJSC
Customer:
Dnieper Cascade of HPPs and PSPPs, Ukrhydroenergo PJSC
Project implementation deadlines:
2012 - 2025
List of completed works:
- supply of equipment for the PP1 switchgear (VP 0.4/0.23 kV internal installation switchgear panel, consisting of cabinets and 2 auxiliary transformers) for the needs of Dnipro HPP branch
- supply of pumping equipment within the framework of the project “Reconstruction of the fire-fighting pumping station and networks of power plant building of Dnipro HPP branch”
- supply of crane equipment within the framework of the project “Overhaul of 2×50+5t gantry crane and crane railways of Dnipro HPP-1 trailrace service bridge crane”
- electrical installation works on Kaniv HPP branch No. 5 unit reconstruction with the replacement of power transformer and RIP-insulated busbar system and equipment supply
- electrical installation works on power transformers and RIP-insulated busbar systems replacement with equipment supply to Dnipro HPP branch
- works on the restoration of the unit transformer IPB busbar system of Dnipro HPP-2 branch with equipment supply
- Implementation of HPPs rehabilitation project with EBRD and MAP funds in terms of the supply of transformer and wall bushings supply for Dnister HPP and Kakhovka HPP branches
- supply of main contacts set for 150 kV 2000 A disconnectors;
- supply of 430 MVA power transformer for Dnister PSPP branch with 330 kV transformer bushings
- dismantling and installation works, installation supervision and commissioning of 10-280 MVA oil-immersed power unit transformers (8 units) for Dnipro HPP, Kakhovka HPP and Kaniv HPP branches
- dismantling and installation works, installation supervision and commissioning of 70-280 MVA oil-immersed unit power transformers (10 units) for Kyiv HPP and Kyiv PSPP, Kaniv HPP, Kremenchuk HPP, Seredniodniprovska HPP, Dnipro HPP, Kakhovka HPP branches
- replacement of high-voltage bushings on power transformers for Kremenchuk HPP and Seredniodniprovska HPP branches
- design, supply and installation of IPB busbar systems of 2400 m total length, construction and installation works for Dnister PSPP branch