Ukrenergo NEC PJSC

icon
Customer:

Substations of Ukrenergo NEC PJSC power systems

icon
Project implementation deadlines:

2010 - 2020

List of completed works:
  • supply of 35-750 kV current and voltage instrument transformers for the needs of  Western, Southern, Southern – Western, Dnipro, Donbass, Central power grids substations
  • supply of 110-330 kV transformer bushings for the needs of 220 kV Kalush SS and for substations of  Northern, Southern, Eastern, and Western regional grid maintenance centers

Our other projects at energy and industrial
facilities in Ukraine:

2012 - 2025

List of completed works:

supply of equipment for the PP1 switchgear (VP 0.4/0.23 kV internal installation switchgear panel, consisting of cabinets and 2 auxiliary transformers) for the...
2010 - 2022

List of completed works:

supply of 35-750 kV current and voltage instrument transformers for the needs of Rivne NPP, Khmelnytsky NPP, Zaporizhzhia NPP, South Ukraine NPP and Central re...

List of completed works:

Supply of 110 kV, 150 kV, 220 kV, 330 kV RIP-insulated transformer and wall bushings and 110 kV voltage transformers for such holding divisions as: DTEK  Kyiv ...

List of completed works:

supply of 110 kV SF6 circuit breakers, 110 kV disconnectors, complete transformer substations (CTSs), power transformers, a complex of REL 650 relay protection...

List of completed works:

Supply of TDTN-25000/110 U1 power transformers. Delivery site: Ladyzhyn closed cycle chicken meat production complex, Ladyzhyn, Vinnytsya region, Ukraine Suppl...

List of completed works:

Supply of 150 kV measuring current transformers. Delivery site: 150/35 SS Olviya, for the needs of Wind Parks of Ukraine. In collaboration with Elpromproekt LL...
2009 - 2021

List of completed works:

Supply of 330 kV voltage transformers, 110 kV current and voltage transformers. Delivery site:  Slavyanskaya TPP,  for the needs of Donbasenergo PJSC Supply of...