2012 - 2025
List of completed works:
supply of equipment for the PP1 switchgear (VP 0.4/0.23 kV internal installation switchgear panel, consisting of cabinets and 2 auxiliary transformers) for the...List of completed works:
supply of equipment for the PP1 switchgear (VP 0.4/0.23 kV internal installation switchgear panel, consisting of cabinets and 2 auxiliary transformers) for the...List of completed works:
supply of 35-750 kV current and voltage instrument transformers for the needs of Rivne NPP, Khmelnytsky NPP, Zaporizhzhia NPP, South Ukraine NPP and Central re...List of completed works:
supply of 35-750 kV current and voltage instrument transformers for the needs of Western, Southern, Southern – Western, Dnipro, Donbass, Central power g...List of completed works:
Supply of 110 kV, 150 kV, 220 kV, 330 kV RIP-insulated transformer and wall bushings and 110 kV voltage transformers for such holding divisions as: DTEK Kyiv ...List of completed works:
supply of 110 kV SF6 circuit breakers, 110 kV disconnectors, complete transformer substations (CTSs), power transformers, a complex of REL 650 relay protection...List of completed works:
Supply of TDTN-25000/110 U1 power transformers. Delivery site: Ladyzhyn closed cycle chicken meat production complex, Ladyzhyn, Vinnytsya region, Ukraine Suppl...List of completed works:
Supply of 170 kV measuring current and voltage transformers for the needs of 154 kV SS, ArcelorMittal Kryvyi Rih РJSC, in collaboration with Elpromproekt LLC S...List of completed works:
Supply of 150 kV measuring current transformers. Delivery site: 150/35 SS Olviya, for the needs of Wind Parks of Ukraine. In collaboration with Elpromproekt LL...List of completed works:
Supply of 330 kV voltage transformers, 110 kV current and voltage transformers. Delivery site: Slavyanskaya TPP, for the needs of Donbasenergo PJSC Supply of...