Ukrhydroenergo PJSC

icon
Customer:

Dnieper Cascade of HPPs and PSPPs, Ukrhydroenergo PJSC

icon
Project implementation deadlines:

2012 - 2025

List of completed works:
  • supply of equipment for the PP1 switchgear (VP 0.4/0.23 kV internal installation switchgear panel, consisting of cabinets and 2 auxiliary transformers) for the needs of Dnipro HPP branch
  • supply of pumping equipment within the framework of the project “Reconstruction of the fire-fighting pumping station and networks of power plant building of Dnipro HPP branch”
  • supply of crane equipment within the framework of the project “Overhaul of 2×50+5t gantry crane and crane railways of Dnipro HPP-1 trailrace service bridge crane”
  • electrical installation works on Kaniv HPP branch No. 5 unit reconstruction with the replacement of power transformer and RIP-insulated busbar system and equipment supply 
  • electrical installation works on power transformers and RIP-insulated busbar systems replacement with equipment supply to Dnipro HPP branch 
  • works on the restoration of the unit transformer IPB busbar system of Dnipro HPP-2 branch with equipment supply 
  • Implementation of HPPs rehabilitation project with EBRD and MAP funds in terms of the supply of transformer and wall bushings supply for Dnister HPP and Kakhovka HPP branches
  • supply of main contacts set for 150 kV 2000 A disconnectors;
  • supply of 430 MVA power transformer for Dnister PSPP branch with 330 kV transformer bushings
  • dismantling and installation works, installation supervision and commissioning of 10-280 MVA oil-immersed power unit transformers (8 units) for Dnipro HPP, Kakhovka HPP and Kaniv HPP branches 
  • dismantling and installation works, installation supervision and commissioning of 70-280 MVA oil-immersed unit power transformers (10 units) for Kyiv HPP and Kyiv PSPP, Kaniv HPP, Kremenchuk HPP, Seredniodniprovska HPP, Dnipro HPP, Kakhovka HPP branches
  • replacement of high-voltage bushings on power transformers for Kremenchuk HPP and Seredniodniprovska HPP branches 
  • design, supply and installation of IPB busbar systems of 2400 m total length, construction and installation works for Dnister PSPP branch

Our other projects at energy and industrial
facilities in Ukraine:

2010 - 2022

List of completed works:

supply of 35-750 kV current and voltage instrument transformers for the needs of Rivne NPP, Khmelnytsky NPP, Zaporizhzhia NPP, South Ukraine NPP and Central re...
2010 - 2020

List of completed works:

supply of 35-750 kV current and voltage instrument transformers for the needs of  Western, Southern, Southern – Western, Dnipro, Donbass, Central power g...

List of completed works:

Supply of 110 kV, 150 kV, 220 kV, 330 kV RIP-insulated transformer and wall bushings and 110 kV voltage transformers for such holding divisions as: DTEK  Kyiv ...

List of completed works:

supply of 110 kV SF6 circuit breakers, 110 kV disconnectors, complete transformer substations (CTSs), power transformers, a complex of REL 650 relay protection...

List of completed works:

Supply of TDTN-25000/110 U1 power transformers. Delivery site: Ladyzhyn closed cycle chicken meat production complex, Ladyzhyn, Vinnytsya region, Ukraine Suppl...

List of completed works:

Supply of 150 kV measuring current transformers. Delivery site: 150/35 SS Olviya, for the needs of Wind Parks of Ukraine. In collaboration with Elpromproekt LL...
2009 - 2021

List of completed works:

Supply of 330 kV voltage transformers, 110 kV current and voltage transformers. Delivery site:  Slavyanskaya TPP,  for the needs of Donbasenergo PJSC Supply of...